The link node allows a branch exit from one node to link to a node
elsewhere in the control plan. When an executing control flow
reaches the link node, the system will jump to the node named by
the Link node.
Configuration
The Link node must be configured with the node to which execution
should jump. The options in this node will depend on the control
flow and will change as the control flow itself is adjusted.
For example, this link node is configured to jump to node with
number 2, which is a Connect node: